
| Step | Preview | Additional Notes |
|---|---|---|
| 1.1 Introduction | ![]() |
Check the parts, tools and assembly sequence before starting. |
| Step | Preview | Additional Notes |
|---|---|---|
| 2.1 Wheel Assembly | ![]() |
Prepare the wheel assemblies for the machine carriages. |
| 2.2 Y-Plate Assembly | ![]() |
Build the left and right Y-plate assemblies, checking their orientation. |
| 2.3 X-Carriage Assembly | ![]() |
Assemble the X carriage and Z axis, including the Z inductive switch. |
| 2.4 X-Gantry Assembly | ![]() |
Build the X gantry and fit its carriage and lead screw. |
| 2.5 Base Assembly | ![]() |
Assemble the base frame and check it is square before tightening. |
| 2.6 Y-Gantry Assembly | ![]() |
Fit the gantry to the Y axes and install the clip-in motor covers. |
| 2.7 Router Mount | ![]() |
Fit the correct mount for your router head and secure the router. |
| Step | Preview | Additional Notes |
|---|---|---|
| 3.1 Drag Chains | ![]() |
Fit both drag chains and their brackets before routing the cables. |
| 3.2 Limit Switches | ![]() |
Install the X, Y1 and Y2 inductive switches. The Z switch is fitted during 2.3. |
| 3.3 Power Supply & Emergency Stop | ![]() |
Prepare the power supply and emergency stop with mains power disconnected. |
| 3.4 Wire Routing and Controller Mounting | ![]() |
Mount the case and PCB, route the cables, and fit the cable ties and orange sleeve. |
| 3.5 Controller Wiring | ![]() |
Connect the motors, sensors and power to Motion Control Core, then fit the lid. |
| 3.6 Final Assembly | ![]() |
Secure the machine and side drag chain to the table, then fit the ID plate. |
Use USB for initial setup, including machines that will later use Wi-Fi or Ethernet.
| Step | Preview | Additional Notes |
|---|---|---|
| 4.1 Download Ooznest Control | ![]() |
Choose the desktop application or online version. |
| 4.2 First Connection and Setup | ![]() |
Start with USB and configure the actual machine and accessories. |
| 4.3 Testing Your WorkBee | ![]() |
Emergency stop, inductive inputs, homing, movement and lead-screw tensioning. |
| Step | Preview | Additional Notes |
|---|---|---|
| 5.1 Spoilboard | ![]() |
Prepare and secure the MDF spoilboard, then level it using the Surfacing Wizard. |
| Step | Preview | Additional Notes |
|---|---|---|
| 6.1 Safety Instructions | ![]() |
Read before first use and follow whenever operating the machine. |
| 6.2 Ooznest Control Overview | ![]() |
Find the main controls, jogging, preview, probing and troubleshooting tools. |
| 6.3 First Project | ![]() |
Set work zero, check the toolpath and run your first job with Ooznest Control. |