 |
- Using 8 x M5-Button-Head-Bolt-12mm and 8 x M5-Drop-In-Tee-Nut secure the Spoilerboard to the front and back Extrusion-A's.
- Make sure the M5-Drop-In-Tee-Nuts are engaged with the slot on Extrusion-A.
- A good technique, is to tighten, then loosen the bolt, then tighten, each time tightening a bit more. This helps the M5-Drop-In-Tee-Nut to engage with the slot.
- Once you have the Spoilerboard in place you use a variety of methods to hold down your projects.
- The UJK System from Axminster is very good.
- Or you can also do a pronged tee nut system.
|